Home › Purchase orders & ordering
Made in NZ · For NZ buildersPurchase orders & materials ordering
Raise a purchase order against a job, email it to the supplier, and order materials straight off your take-off — then watch ordered vs received and match supplier bills back to the PO that paid for them.
No credit card · Cancel anytime · Works offline on site · Flat NZD pricing
Raise POs against the job, not a spreadsheet
Every purchase order sits on the job it belongs to. You get an auto-generated PO number and creation date, and each PO carries the supplier, a description of the materials, an estimated ex-GST amount, an expected delivery date and any notes. Raise it, send it, and keep it moving.
- Send it to the supplier. Toolie pulls the supplier’s email from your saved merchants directory and builds a pre-filled message — PO number, job, client, site, account number, materials, estimated ex-GST value and the delivery address and date — then opens it in your device mail client or share sheet. If there’s no email on file, a quick capture box asks for the rep’s address and saves it back for next time.
- Move it through a status. Mark a PO sent, received (which stamps a received date), partial delivery or cancelled — and edit or delete when things change.
- Catch late deliveries. Any PO that isn’t received or cancelled and is past its expected date is flagged at the top of the tab with a warning banner and chips.
- See where the money is. A per-job roll-up shows the count of live orders, total ordered dollars (cancelled orders excluded) and total received.
Order materials straight from the take-off
The Materials tab takes the quoted lines from a job’s take-off, groups them by supplier, and lets you tick the lines you want. From there you can email a firm order or a quote request to each supplier with coded lines, quantities and a per-supplier subtotal — and each supplier only sees their own items.
- Turn a group into a real PO. One tap creates a PO in the register from a supplier’s selected lines, with the amount summed from the ex-GST supplier costs and a description built for you. It warns if a PO from that quote already exists.
- Check your prices are current. Toolie compares each coded line against your pricebook — honouring your own saved prices — and offers a one-tap re-price to today’s numbers before you order, updating the quote total too.
- Stage the deliveries. A just-in-time mode splits the bill of materials into phase-timed drops with a working-day buffer, so gear lands just before it’s needed. These are estimated dates off your programme, not booked deliveries.
- Watch the long-lead items. A heuristic lead-time check by category keyword — joinery, aluminium windows, stone benchtops, tiles, steel, appliances and more — flags long-lead items not yet ordered against the job start date, ranked critical, urgent or soon. Treat these as prompts, not confirmed supplier lead times.
- Take a list to the merchant. Print a flat per-supplier shopping list as a PDF, or quick-add an unknown supplier to your merchants directory right from the ordering screen.
Ordered vs billed, both ex GST
Link supplier bills to the PO they pay and compare ordered against billed — both normalised to ex GST, since bills are stored GST-inclusive and POs ex GST. A variance chip tells you whether it’s over (more than 2%), partially billed or matches, and you can link or unlink bills as they come in. It compares totals, not line items — there’s no three-way line match.
What Toolie doesn’t do here
Being straight about it: Toolie opens a pre-filled email draft in your own mail app — it doesn’t send through Toolie’s servers, so you hit send yourself. The PO email is plain text, not a branded PDF purchase-order document. There’s no supplier portal, acknowledgement, EDI or live trade-catalogue feed — orders go out by email or PDF and confirmation comes back by reply. “Received” and “partial” are whole-PO flags, not per-line quantity receipting, and POs live on each job rather than in a company-wide register.
Pairs with estimating and take-offs, quoting, subcontractor management and cashflow forecasting.
Common questions
Can I create purchase orders straight from my quote or take-off?
Yes. The Materials tab groups your quoted take-off lines by supplier, and one tap turns a supplier's selected lines into a real PO in the register, with the amount summed from the ex-GST supplier costs and a description built for you. It warns if a PO from that quote already exists so you don't double up.
How does Toolie send a purchase order to the supplier?
It pulls the supplier's email from your saved merchants directory and builds a pre-filled message with the PO number, job, client, site, account number, materials, estimated ex-GST value and delivery details, then opens it in your device mail app or share sheet. You hit send yourself — Toolie doesn't send through its own servers — and the PO is stamped with who it was emailed to and when.
Can I match supplier bills back to the purchase order?
Yes. You can link supplier bills to the PO they pay and compare ordered against billed, both normalised to ex GST. A variance chip shows over (more than 2%), partially billed or matches. It compares totals only — there's no line-item or three-way match.
Are the lead-time and staged-delivery dates confirmed with suppliers?
No. Lead-time flags come from category keyword matching against typical NZ timeframes, and staged-delivery dates are worked out from your programme with a working-day buffer. They're estimates to prompt you, not confirmed supplier lead times or booked deliveries — always confirm timing and trade pricing with the merchant.
Quote, comply and get paid — in one place
Start free today. Built around NZS 3604, H1, Healthy Homes & CCA 2002. One flat price for your whole crew.
Quote a job free →